Scroll Top

Early Works Steel

EARLY WORKS STEEL

Temporary/Early Works in construction are the activities that are required to prepare a construction site for the main works or permanent works. The opportunity to de-risk projects through proactively identifying, designing, fabricating, and installing Temporary/Early Works ahead of the main or permanent construction has a major impact on infrastructure projects successfully staying on budget and on schedule.

Clear Filters
Broadway Subway Project
Broadway Subway Project

If a project requires cut and cover construction, Saskarc is equipped to supply:

  • Temporary Traffic/Equipment Decking Systems
  • Reusable Walers & Struts
  • Temporary Walers & Struts
  • Utility Trays/Supports and/or Pipe Supports
  • Raw Piling Materials (Sheet, Pipe, HP, W Sections)

If a project requires vertical shaft excavation, Saskarc is equipped to supply:

  • Temporary Traffic/Equipment Decking System
  • Reusable Walers & Struts
  • Temporary Walers & Struts
  • Utility Trays/Supports and/or Pipe Supports
  • Raw Piling Materials

If a project requires a tunnel boring machine (TBM), Saskarc is equipped to supply:

  • Gallow Beams
  • TBM Back-up Supports

Temporary steel

bridges