Temporary Steel
Temporary steel is vital for support of excavation and tunneling in advance of the permanent works for infrastructure projects such as subways and other large-scale excavation projects. Temporary steel structures are required to enable safe and efficient construction when building a permanent structure and are equally as important. Saskarc is constantly innovating new systems and procedures to fabricate structural steel for complex structures and spends considerable time & planning so that our clients get the best results, for the lowest total installed cost. Our infraMOD methodology prioritizes upfront design, leveraging expert engineers and automated processes to ensure the most efficient and cost-effective fabrication and installation.
Check out our project case studies to see how our clients have found success with Saskarc’s temporary steel solutions!
Saskarc Scope
If a project requires cut and cover construction, Saskarc is equipped to supply:
- Temporary Traffic/Equipment Decking Systems: maintaining traffic flow and safe equipment access.
- Reusable and Temporary Walers & Struts: ensuring stability and support for excavation walls.
- Utility Trays/Supports and Pipe Supports: protecting vital utilities during construction.
- Raw Piling Materials: sheet, pipe, HP, and W sections for diverse temporary structures.
If a project requires vertical shaft excavation, Saskarc is equipped to supply:
- Temporary Traffic/Equipment Decking System: providing safe access and movement around the excavation shaft.
- Reusable and Temporary Walers & Struts: preventing collapse and ensuring worker safety.
- Utility Trays/Supports and Pipe Supports: safeguarding utilities near the shaft.
- Raw Piling Materials: tailored to the specific ground conditions of your project.
If a project requires a tunnel boring machine (TBM), Saskarc is equipped to supply:
- Gallow Beams
- TBM Back-up Supports
If a project requires bridge work over water, Saskarc is equipped to supply:
- Temporary Trestle Bridges
- Raw Piling Materials (Pipe, HP, W Sections)
- Cofferdams
- Floating Platforms
- Bubble Curtain Rings
Broadway Subway Project
Saskarc was approached by Acciona-Ghella to provide a solution for design, supply, and delivery of a temporary traffic decking system.
Saskarc performed a variety of work for this project. The scope of the work included:
- Temporary Traffic Decks
- Steel Girders
- Walers
- Struts
- TBM Supports
- Gallow Beams
- Pipe & W Beam Piling
Nisutlin Bay Bridge
If a project requires cut and cover construction, Saskarc is equipped to supply:
- Temporary Traffic/Equipment Decking Systems: maintaining traffic flow and safe equipment access.
- Reusable and Temporary Walers & Struts: ensuring stability and support for excavation walls.
- Utility Trays/Supports and Pipe Supports: protecting vital utilities during construction.
- Raw Piling Materials: sheet, pipe, HP, and W sections for diverse temporary structures.
If a project requires vertical shaft excavation, Saskarc is equipped to supply:
- Temporary Traffic/Equipment Decking System: providing safe access and movement around the excavation shaft.
- Reusable and Temporary Walers & Struts: preventing collapse and ensuring worker safety.
- Utility Trays/Supports and Pipe Supports: safeguarding utilities near the shaft.
- Raw Piling Materials: tailored to the specific ground conditions of your project.
If a project requires a tunnel boring machine (TBM), Saskarc is equipped to supply:
- Gallow Beams
- TBM Back-up Supports
Project Feature