3 STEEL Detailing Myths Busted
TL;DR
One misaligned bolt hole can shut down a multimillion-dollar excavation project. Here’s why steel detailing is your project’s make-or-break moment.
Think detailing is just fancy drafting? Think again.
This article demolishes three dangerous myths that cost contractors serious money:
Myth #1
Detailing is just drafting”
(It’s actually engineering + code compliance + logistics + site reality)
Myth #2
The shop will catch mistakes”
(By then, the project is bleeding cash on rework)
Myth #3
Design drawings are enough to build from”
(Spoiler: they’re not)
What you’ll learn:
How skilled steel detailers turn high-level designs into fabrication instructions, why an error in steel detailing can cost weeks and thousands of dollars, and why treating detailing as an investment, not an expense, separates successful excavation projects from costly disasters.
Bottom line:
Great steel detailing makes everything fit perfectly. Bad detailing makes everything expensive.
The High Stakes of Steel Detailing
One wrong hole size. One mismatched bolt grade. One missed weld access point.
That’s all it takes to grind a multimillion-dollar project to a halt. Crews wait. Cranes sit idle. Costs rise by the minute.
In the world of structural steel, detailing isn’t just another step in the process; it’s the backbone of a successful build. Get it right, and everything flows. Get it wrong, and the consequences multiply fast.
One wrong hole size.
A single misaligned bolt hole can grind everything to a halt.
One mismatched bolt grade.
Wrong specifications mean costly material replacement.
One missed weld access point.
Inaccessible welds require complete redesign and rework.
That's all it takes
to grind a multimillion-dollar project to a halt. Crews wait. Cranes sit idle. Costs rise by the minute.
So What is Detailing in Support of Excavation Work?
In civil infrastructure projects, especially those involving support of excavation, steel detailing is the process of turning an engineered design into precise, buildable instructions for fabrication and installation.
While engineering drawings show the concept, for example, the location, size, and loading of walers, struts, or tiebacks, detailing takes it several steps further. It specifies exact dimensions, material grades, weld types, bolt sizes, hole locations, plate thicknesses, and connection details. Think of it as translating the “what” and “why” from the engineer into the “how” that fabricators and site crews can follow without guesswork.
Engineering Drawings Show
- The concept
- Location, size, and loading
- Walers, struts, or tiebacks
Detailing Specifies
- Exact dimensions
- Material grades & weld types
- Bolt sizes & hole locations
- Plate thicknesses & connections
Good steel detailing in support of excavation works anticipates practical realities:
Can this plate be welded in position?
Ensuring weld accessibility during assembly
Will that bolt be accessible once the strut is in place?
Planning for assembly sequence and access
Is the steel section available from local suppliers?
Material availability and lead time planning
Can this plate be welded in position?
Ensuring weld accessibility during assembly
Will that bolt be accessible once the strut is in place?
Planning for assembly sequence and access
Is the steel section available from local suppliers?
Material availability and lead time planning
These questions are addressed before a single piece of steel is cut, reducing costly rework and delays.
In support of excavation, clear and accurate detailing is critical. The temporary works must fit the excavation geometry exactly, align with existing structures, and handle loads safely. Done well, detailing bridges the gap between design intent and on-site execution, ensuring the structure performs as intended while keeping the project on schedule and budget.
Busting Steel Detailing Myths
Three dangerous misconceptions that cost contractors serious money
Myth: "Steel Detailing is just drafting"
Click to reveal the reality behind this costly misconception
Myth: "Detailing is just drafting"
Reality:
Detailing is engineering, fabrication, logistics, code compliance and site knowledge fused together. A good detailer visualizes the finished structure before the first model line is drawn.
What Drafting Is:
- Drawing lines and dimensions
- Creating technical illustrations
- Basic CAD operations
What Detailing Actually Involves:
- Engineering analysis & code compliance
- Fabrication process optimization
- Site logistics & erection sequencing
- Material sourcing & lead times
- 3D modeling & clash detection
Myth: "The shop will catch mistakes"
Discover why this assumption leads to expensive delays
Reality:
By the time an error reaches the shop floor, it’s already expensive. The wrong part might be fabricated, coated, and shipped — only to be cut apart or scrapped. The cost in rework, delays, and wasted material far exceeds the cost of getting it right at the detailing stage.
Engineering Drawings Show
- The concept
- Location, size, and loading
- Walers, struts, or tiebacks
Detailing Specifies
- Exact dimensions
- Material grades & weld types
- Bolt sizes & hole locations
- Plate thicknesses & connections
Cost Escalation Timeline:
- Detailing Stage: $100 to fix
- Fabrication Stage: $1,000+ in rework
- Site Installation: $10,000+ in delays & replacement
The cost in rework, delays, and wasted material far exceeds the cost of getting it right at the detailing stage.
Myth: "You can fabricate from design drawings"
Learn why design drawings aren't enough for fabrication
Reality:
Design drawings only show concepts. Steel Detailers must integrate all project data (drawings, specifications, RFIs, change notices) into a complete, buildable model that ensures structural integrity and matches the engineer’s intent that meets industry specific codes.
Reality:
Detailers take all the data provided; Design Drawings, Specifications, Connection Design, Design Memos, Addendums, ECN’s, RFI’s, and meeting minutes to piece the entire project together into a fully functional model (that complies with industry standard codes) to ensure everything can be fabricated, delivered, and erected to suit the Engineers overall intent while maintaining structural integrity.
Design Drawings Provide:
- General layout & dimensions
- Load requirements
- Basic connection details
- Material specifications
Detailed Models Include:
- Every bolt, washer, and weld
- Fabrication sequences
- Shipping piece breakdown
- Erection drawings
- Code compliance verification
What a Steel Detailer Actually Does
A steel detailer translates high-level engineering designs into precise fabrication and erection instructions.
Design data comes in many forms; drawings, specifications, addendums, RFIs, engineering change notices. This information must be distilled into clear, error-free shop drawings, reports, and data files.
Modern steel detailing means building the entire structure in a 3D, fully connected model, down to every bolt, washer, and weld. It’s about ensuring every part can be fabricated, shipped, and erected without surprises. It’s about knowing what fits not just on paper, but in real-world equipment, trucks, and job sites. And this is especially true for support of excavation projects. If the steel detailers don’t get it right, it could lead to increased costs, delays & more dangerously, increase safety risks.
The Scope of Knowledge
A competent steel detailer must balance design intent, fabrication realities, and site constraints. That requires a broad range of expertise:
Materials & Fabrication:
Understanding steel grades, coating types, lead times, and equipment capabilities. Knowing what materials can be sourced quickly; and which must be released early to avoid delays.
- Understanding steel grades and coating types
- Equipment capabilities and lead times
- Material sourcing and availability
- Release timing for long-lead items
Assembly & Erection:
Sequencing the project for multiple fabrication sites. Ensuring weld access, safe lifting points, and erection tolerances. Thinking like the crew on the ground.
- Project sequencing for multiple sites
- Ensuring weld access and lifting points
- Erection tolerances and safety
- Ground crew perspective and workflow
Technology & Data Integration:
Creating NC1, DXF, and robotic welding files. Feeding MRP systems with clean, compatible data. Producing drawings and reports that integrate seamlessly into the fabricator’s workflow.
- Creating NC1, DXF, and robotic welding files
- MRP system data compatibility
- Seamless fabricator workflow integration
- Drawing and report production
Coordination & Flexibility:
Managing constant change; design revisions, scope adjustments, site issues, while keeping drawings accurate and up to date.
- Managing constant design revisions
- Scope adjustments and site issues
- Keeping drawings accurate and current
- Cross-team communication and updates
Imagine a bracing assembly with missing or misaligned bolt holes. The parts arrive on site, the crane is waiting, but the pieces won’t fit.
Here is what will happen:
A single detailing oversight can cause weeks of disruption and thousands in unplanned costs.
Why Detailing is an investment
Every extra hour spent in precise detailing saves multiple hours in fabrication and erection. It reduces waste, eliminates rework, and keeps the schedule intact.
In structural steel, accuracy isn’t optional. It’s the difference between a project that runs like clockwork and one that bleeds time and money. The detailer’s job is to make sure the only surprises on site are how smoothly everything fits together.
Steel Detailing: Where Support of Excavation Projects Succeed or Fail
In structural steel, the difference between smooth progress and costly chaos often comes down to one thing — detailing.
A single missed dimension can halt crews, idle cranes, and burn thousands of dollars a day. Great detailing prevents that.
It’s not “just drafting.” A skilled steel detailer turns high-level designs into precise, build-ready instructions – every bolt, washer, and weld modeled, sequenced, and checked. We think like fabricators, plan like erectors, and coordinate like project managers.
When detailing is done right, fabrication flows, shipping is seamless, and site erection happens without surprises. When it’s done wrong? Delays multiply, costs skyrocket, and reputations take a hit.
Detailing is an investment, not an expense. It’s the quiet, behind-the-scenes work that makes sure the only surprise on site is how smoothly everything fits together.
Myth #1: “Steel detailing is just drafting” – In reality, detailing combines engineering, fabrication knowledge, logistics, and site expertise. A good detailer visualizes the finished structure before modeling the first member or drawing the first line.
Myth #2: “The shop will catch mistakes” – By the time errors reach the shop floor, they’re already expensive. Wrong parts get fabricated, coated, and shipped before problems are discovered, leading to costly rework and delays.
Myth #3: “You can fabricate from design drawings” – Design drawings only show concepts. Steel detailers must integrate all project data (drawings, specifications, RFIs, change notices) into a complete, buildable model that ensures structural integrity and matches the engineer’s intent that meets industry specific codes.
Steel detailing transforms engineering concepts into precise, buildable instructions. When done right, everything flows smoothly. When done wrong, the article emphasizes that one wrong hole size, mismatched bolt grade, or missed weld access point can halt a multimillion-dollar project. Consequences multiply rapidly with crews waiting, cranes sitting idle, and costs rising by the minute.
Detailing in support of excavation work is the process of turning engineered designs into precise, buildable instructions for fabrication and installation. While engineering drawings show the concept (location, size, loading of walers, struts, tiebacks, connection details that provide weld types, bolt sizes/grades, and plate thickness), steel detailers need to take this conceptual information and make it work for every connection. For example, exact plate sizes, specific weld types, bolt sizes and hole locations, material grades, and geometry at each location in the project to ensure proper fit and function.
The article describes a bracing assembly with misaligned bolt holes. When parts arrive on site, they won’t fit, causing the crew to stop work, the crane to sit idle at thousands per day, parts to go back for rework, and delivery schedules to shift downstream. This single oversight in steel detailing can cause weeks of disruption and thousands in unplanned costs.
Modern detailing means building the entire structure in a 3D, fully connected model, down to every bolt, washer, and weld. It ensures every part can be fabricated, shipped, and erected without surprises, considering real-world equipment, trucks, and job site constraints.
The article outlines four key areas:
- Materials & Fabrication (understanding steel grades, coating types, lead times, equipment capabilities),
- Assembly & Erection (sequencing projects, ensuring weld access, safe lifting points, erection tolerances),
- Technology & Data Integration (creating NC1, DXF, and robotic welding files), and
- Coordination & Flexibility (managing constant design changes while keeping drawings accurate).
The article mentions three critical questions (and there are several), that good steel detailing answers before any steel is cut:
- Can this plate be welded in position?
- Will that bolt be accessible once the strut is in place?
- Is the steel section available from local suppliers?
These questions help reduce costly rework and delays.
Every extra hour spent in precise steel detailing saves multiple hours in fabrication and erection. It reduces waste, eliminates rework, and keeps schedules intact. The steel detailer’s job is to ensure “the only surprises on site are how smoothly everything fits together,” making detailing a critical investment in project success rather than just another cost.
While it’s not a standalone contract, adherence is a requirement for doing business with Saskarc.
Depending on the severity, it may lead to corrective actions, suspension, or termination of the relationship.
Yes. We expect all suppliers to cascade these expectations down to their own supply chain.
Absolutely. Saskarc provides support and clarification where needed to help partners meet the standards.
No. The code applies to all suppliers, regardless of geography.
You can find it here : Saskarc policies